Labs for Rent

Availablity-Charnwood-Hero-Half-Page-960-400

World-Class Facilities

Set in 70 acres of landscaped grounds, the park combines nature with modern facilities to create the ideal conditions for start-ups and established enterprises to grow their businesses. The site offers immediately occupiable laboratory and office space, and over 12 acres of development land.

B42-side-1

Building 42 Chemistry Laboratory

Available

A high-specification, self-contained chemistry building refurbished to a very high standard in 2022. The building has been fitted out to a market-leading specification, featuring 225 fume hoods, including walk-in hoods, internal solvent stores, two external solvent stores fully integrated into the BMS, CCTV and access control, EV charging points, ample car parking, dedicated goods vehicle access route.

There is also a variety of flexible benching, recirculating fume hoods, containment, and laminar flow units. The space comprises 57,994 SF (GIA 111,385 SF) of flexible multipurpose laboratory accommodation, presented as 33,533 SF of fully fitted high-quality CL2 lab space and 23,628 SF of fitted offices, including a high-spec reception area with an AV system.

charnwood_building_39_034-scaled-1

Building 39 Biochemistry Laboratory

Available

State-of-the-art fully fitted biochemistry laboratory space within a previously MHRA-approved facility, featuring 17,911 SF of high spec CL2 lab space and 5,224 SF of open-plan office space, overlooking beautifully landscaped lakes and grounds. The building was refurbished to a very high standard in 2018 and has been excellently maintained to date.

The lab facilities comprise gowning areas, benching, fume cabinets, and are suitable for the integration of high spec lab equipment. The building features a variety of modern board and meeting rooms, eye catching reception area and staff breakout areas. ideal for R&D or manufacturing use (with flexibility for a new development).The building also offers good vehicle access routes and car parking provisions.

DJI_20241216115305_0053_D-scaled-1

B31 Office Building

Available

13,529 SF of state-of-the-art office facilities refurbished to a very high standard in 2018. The building is arranged over two floors and features modern boardrooms and meeting rooms, two staff breakout spaces, a private entrance gate, and car parking.

Charnwood Building 25

Building 25

Available

Building 25 is the focal point of the campus and provides a unique working environment for any business. The building supports flexible office and laboratory space. There is approx. 44,000sq m of space that could be configured to suit a variety of business needs (160,522 sq. ft)

Analytics Building

Analytics Building

Available

The Analytics Building is a recently refurbished facility comprising 150,000sqft of flexible multipurpose laboratory space. All the laboratory areas have associated office and write up accommodation and the building is ready for immediate occupancy.

Charnwood Building 45

Building 45

Available

Our expansion plans for the business are now coming to fruition. From hiring significant numbers of new scientists at both of our existing research sites, through to a doubling of our business development team and now adding much larger bespoke facilities, we are looking to the future to make Charnwood Molecular a very major player in the discovery CRO marketplace.
John Handley, Managing Director of Charnwood Molecular

Development Land

Charnwood Campus offers design and build solutions for companies that require bespoke laboratories, office space or manufacturing space here at Charnwood Campus.

Charnwood-Buildings-plot-A-new-new

Plot A

2.13 Ha of development land

Charnwood-Plot-B

Plot B

0.76 Ha of development land

Charnwood-Plot-C

Plot C

2.08Ha of development land

Development Land,
Plot Location

Services are available to all plots, outline planning permissions and all access roads in place.

Development land